【New, Unopened】Tension Rod Curtain Pole / Partition / Room Divider *Includes Bonus!
【New, Unopened】Okay for Rentals! Tension Rod Curtain Pole - No Drilling Required! Perfect for Room Privacy and Improving Heating/Cooling Efficiency!
The images are AI-generated illustrations. Please confirm details on the Amazon page below:
https://www.amazon.co.jp/dp/B09NFMGJ2P
?Product supervised by Kumi Suzuki, Level 1 Professional Organizer?
?【Brand】Yoquna (A Japanese brand developed by Postich Co., Ltd., headquartered in Higashiosaka City, Osaka Prefecture)
?【Color】Matte Black
?【Features】Adjustable both vertically and horizontally, allowing you to use your preferred curtains. The matte finish blends well with your decor. Features special rubber caps on the ends to protect floors and ceilings, ensuring safe use.
?【Load Capacity】Approximately 70kg when fully retracted, 50kg when fully extended (excluding when the horizontal extension rod is attached).
?【Vertical and Horizontal Compatible Sizes】
■Main pole only: 106-165cm
■Main pole + short extension rod: 156-214cm
■Main pole + long extension rod: 206-263cm
■Main pole + short extension rod + long extension rod: 257-314cm. With 3 poles, the maximum horizontal width when connected is 628cm.
?【Uses】Tension rod curtains, clothes drying, room dividers, partitions, hanger racks, laundry racks, etc.
Bonus item Amazon URL:
https://www.amazon.co.jp/dp/B08G4J2P22
#curtainpole #tensionrod #roomdivider #privacycurtain #partition
CategoryCurtain Rails & PolesConditionNew/unusedShippingIncluded in price (by seller)FromTokyo
SHIPPINGS
Free shipping in Spanish mainland, Balearic Islands and Portugal.
For other countries the shipping cost will be paid by the client.
DELIVERY TIME (as of delivery)
Spanish mainland, Balearic Islands and Portugal: 1-2 working days.
Other countries, we attach a table with those that are open in the online store, indicating transporter and transit days.
The return period is 14 calendar days from the receipt of the order.
Carriers for change of size in Spanish mainland, Balearic Islands and Portugal, are in charge of 24HRS.